Mommainia Builders on the move
The house is moving along. I got the outside graded, seed planted, and house painted. The inside has primer on the walls, insulation, drywall, mantels, stone and trim is going in.
Taking the holidays into the frame of time to get completed, I will have to delay us moving in until the first or middle of January. I just cannot make the subs work on top of each other and be happy doing it. If I push them it is miserable for all and Christmas would be out of boxes for us. I just don't want to do that to them or me. So, I delayed to give time for the holidays and to each sub to finish before the other moves in. I will put the plumbers, electrical and HVAC together but they work together well anyway and prefer to be there all together.
Take a look at the outside picture, inside foyer wall with stacked stone, and the fireplace with mantel, bench seat to right and TV cabinet to left. The cabinets and seat are not finished so they do not have doors, and trim, but it will give you an idea of what it will look like when finished.
- carrianne's blog
- Login to post comments

